MLCCs and power semiconductors are an overlooked picks-and-shovels play on the still-early AI infrastructure buildout. MLCC demand from AI servers is projected to grow 5x by 2027, with lead times jumping from about 2 weeks to 36 weeks. A move to 800V DC could lift power-semiconductor content from about $9.5K toward $115K per rack. x.comÂ






