Copper connectivity stays in Nvidia's racks longer than anyone modeled, a win for Amphenol and Credo. Per @SemiAnalysis_, the Kyber NVL144 rack is delayed more than 12 months to 2028 because its PCB midplane cannot be made at scale, and the NVL72x2 backup was cancelled. Co-packaged optics will not arrive until the Feynman generation, so the shift away from copper in scale-up moves out with it. x.com






