Hut 8's new Beacon Point lease ranks among the best ever signed by any data center developer. Per Hut 8, the second 352 MW lease doubles a high-investment-grade tenant's capacity to 704 MW and brings 15-year base-term contract value to $19.6B. The triple-net structure means a 100% NOI margin, about $1.86M of average annual NOI per MW with a 3% escalator, against $9-11M per MW of build cost, roughly a 15% yield on cost. x.comÂ