AirJoule is an asymmetric bet that its MOF dehumidification can cut data-center cooling energy costs 40-75%. Moisture removal uses up to 60% of cooling power, and its material regenerates at 60-70°C versus 120-150°C for silica gels, so server waste heat can power it. Over $31M of cash, no debt and ~$3.5M quarterly burn fund it through 2028. Dilution, warrants and a likely $1-2B buyout by Carrier or GE Vernova cap the upside; scale-up costs and fouling are risks. Late-2026 pilot data decides it. x.com
