AXT remains a vital InP substrate bottleneck, and keeping some exposure makes sense because a ton of AI capex flows directly to it, though much is priced in. Transceivers moving from 800G to 1.6T and 3.2T need lasers built on InP substrates, which AXT and Sumitomo supply; demand exceeds supply even as AXT doubles capacity by end-2026. Management sees CPO inflecting late 2027 and beyond. Earnings should improve as backlog converts, though another parabolic move looks unlikely. x.com x.comÂ
