Keel Infrastructure has a realistic path to 10x by leasing the 2.2GW of grid-connected power it already controls. At $150-200 per kW per month, the three leases the CEO targets this year, Panther Creek (350MW), Sharon (110MW) and Moses Lake (18MW), imply $850M-$1.1B of annual revenue. The full pipeline would exceed $4B, and at 6-7x sales for operators with hyperscaler contracts, a conservative multiple implies about $30B. Each signed lease re-rates the rest. x.comÂ
