MARA's accelerating shift into AI infrastructure, plus upside from a bitcoin recovery, makes it attractive. Its $1.5 billion Long Ridge Energy & Power deal adds a 505 MW gas plant in Ohio, lifting power capacity 65% toward a 1GW+ AI campus. The Starwood venture targets 1 GW of IT capacity near term and over 2.5 GW long term, with tenant talks accelerating. Q1 revenue fell 18% on bitcoin prices; MARA sold $1.5 billion of bitcoin to cut debt and fund AI, still holding 50,000+ BTC. x.com