IREN is one of the few neocloud operators that controls its node, owning land and power rights in Texas and Canada at about 3 cents per kWh as power, not GPUs, becomes AI's binding constraint. It has 810 MW operating, 2,100 MW under construction and a five-year, $9.7B Microsoft contract in which IREN bears the capex. The rerating comes as contracted capacity becomes proven delivery, starting with Sweetwater 1; an uncontracted equity raise or Sweetwater delays past Q3 would end the case. x.com x.comÂ