AI power-semiconductor suppliers stand to make generational money as AI racks outgrow data-center wiring. NVIDIA's 2027 rack pulls 600 kW, while wiring built before 2025 was designed for 40 kW, so 800V DC power sidecars are being bolted beside existing racks. Those need silicon carbide and gallium nitride chips, made at volume by only a handful of companies whose stocks fell 40-60% as EV demand slowed. Amazon, Microsoft, Google and Meta are now new customers that are not bargaining on price. x.comÂ




